Progress

Yes ... 2012 is off to a good start. I will have the Ratty-T finished this year. First step toward that was to get the LVVT inspector to come and check out the work completed to date. So that happened today. So heres the list of what needs correcting.

  • Pedal box (Brake pedal needs re-engineering) 
  • Brake push rod (Need to be one machined rod) 
  • Rear suspension needs bump stops 
  • Rear panhard bar needs to be more parallel to diff. 
  • Master brake / booster adapter plate 
  • Front dragbar longer no adapter
So the list is quite long and requires a fair amount of work. But I am pleased that none of that is anything that I have altered changed. All the work I have done passed with flying colours.

So once again Im correcting the bad work carried out previously.